ultra centrifugal wet ball mill
The mill was loaded with kg of 5 mm diameter zirconia balls corresponding to 80% of the mill volume filled by ball bed J = Powder filling was 100% filling of the void of the ball bed at rest in the mill calculated assuming a ball bed porosity of The dry volume of powder required was measured for each sample using a